Amsterdam Logistic Cityhub: More than 11,000 m2 of aluminium windows, doors and curtain wall systems

The Netherlands’ first multi-storey XXL logistics city hub is to be fitted with a high-quality aluminium façade. Commissioned by Bouwbedrijf Vrolijk, V.P.G. Aluminium Ramen en Geveltechniek B.V. will supply and install more than 11,000 m2 of aluminium windows, doors and curtain wall systems, including 10,000 m2 of curtain walling, 26 automatic sliding doors and 100 hinged doors. This makes Amsterdam Logistic Cityhub the largest project to date for the Nieuwkuijk-based façade specialist, which is celebrating its 25th anniversary this year.
V.P.G. is extremely proud to be contributing to this last-mile solution. It is also delighted to have once again earned the trust of Bouwbedrijf Vrolijk to supply and install the aluminium façade systems. “We have been working together for more than 20 years,” says Richard van Zanten, Managing Director and owner of V.P.G. Aluminium Ramen en Geveltechniek B.V. “As with projects such as Fresh2You, Cornelisland I t/m V and Spoormaker, we were involved in this project from the engineering stage. Together, we translated Convexarchitecten’s design into a viable, buildable construction design, without compromising the aesthetic quality envisaged by the architect and client.”
According to Van Zanten, choosing aluminium for this project was a logical decision given its waterside location. Aluminium also offers low weight, high strength and minimal maintenance. “The entire project will use curtain wall profiles and high cover caps from systems supplier Reynaers, extruded to project-specific lengths,” he says. “The CW 50 series was chosen, while the windows and doors will use CS 77. Triple glazing will be used throughout the project.” V.P.G. will start manufacturing the façade elements in early January 2022. Installation will begin a few weeks later. All work will be supervised by the façade specialist’s own site managers and project managers.
According to Van Zanten, the biggest challenge will be the logistics. The curtain walls, with their very large glazed areas, start at a height of 27 metres above ground level. Suspended access platforms will be hung from the roof around the building, and installation work will be carried out from there. For glazing, V.P.G. will use special cranes with considerable lifting height and reach. All products will be delivered to the site just in time and installed immediately. “The weather on site, especially the wind, will have a major impact on the pace of installation. We hope to complete our work as planned in August 2022.”
Question about this story? Ask your question
Who worked on Amsterdam Logistic Cityhub
- precast concrete frameHolcon BVMentioned in One of the largest precast concrete projects currently under way
- architectConvex ArchitectenMentioned in One of the largest precast concrete projects currently under way
- aluminium kozijnen, deuren en vliesgevelsystemenV.P.G. Aluminium Ramen en Geveltechniek B.V.Mentioned in More than 11,000 m2 of aluminium frames, doors and curtain walling systems
- architectConvexarchitectenMentioned in More than 11,000 m2 of aluminium frames, doors and curtain walling systems
- curtain wall profiles and tall cover stripsReynaersMentioned in More than 11,000 m2 of aluminium frames, doors and curtain walling systems
- Property investor and managerCentral Trade Park (CTP)Mentioned in A new perspective on logistics property
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAmsterdam Logistic Cityhub
- ThemeLogistics property that grows with you
- SubjectMaterial handling



















