Material handling

Extreme-format hollow-core slabs and more

Preco supplied over 127,000 m2 of hollow-core slabs in thicknesses ranging from 320 to 500 millimetres.
Preco supplied over 127,000 m2 of hollow-core slabs in thicknesses ranging from 320 to 500 millimetres.

Amsterdam Logistic Cityhub is a project of extremes. The multi-storey distribution centre is gigantic, but its carefully considered design also makes it easy to reconfigure. It was a project of extremes for Preco too. The precast concrete supplier delivered 500-millimetre-thick hollow-core slabs here for the first time. Preco is the only company in the Netherlands to produce slabs of this size. But the ‘order’ from Bouwbedrijf Vrolijk was much bigger still.

“We supplied more than 127,000 m2 of hollow-core slabs for Amsterdam Logistic Cityhub, in various thicknesses ranging from 320 to 500 millimetres,” says Gilian van Lith, project manager at Preco. “The proportion of extreme-format hollow-core slabs was substantial. In total, it came to around 60,000 m2, including slabs measuring no less than 19.5 metres long.”

As well as the hollow-core slabs, Preco also supplied a large batch (6,500 m2) of precast sandwich panels and so-called ‘dock pits’ for the first floor.

As well as the hollow-core slabs, Preco also supplied a large batch (6,500 m2) of precast sandwich panels and so-called ‘dock pits’ for the first floor of the multi-storey distribution centre. Van Lith: “A dock leveller is usually cast in situ. That wasn’t possible on the first floor, so we made 110 precast dock pits. Precast lattice girder slabs, also supplied by us, were installed on top, along with the P&T elements. We also supplied all the staircases and landings for the project. All in all, it was a huge job, and we started production well in advance. The project was assembled incredibly quickly, with three installation teams brought in for the work. Logistics were a major challenge too. On some days, there were as many as 30 to 40 deliveries. That required considerable coordination, but the result speaks for itself.”  

Question about this story? Ask your question

Who worked on Amsterdam Logistic Cityhub

  1. precast concrete frameHolcon BVMentioned in One of the largest precast concrete projects currently under way
  2. engineeringLincon BVMentioned in One of the largest precast concrete projects currently under way
  3. architectConvex ArchitectenMentioned in One of the largest precast concrete projects currently under way
  4. aluminium kozijnen, deuren en vliesgevelsystemenV.P.G. Aluminium Ramen en Geveltechniek B.V.Mentioned in More than 11,000 m2 of aluminium frames, doors and curtain walling systems
  5. architectConvexarchitectenMentioned in More than 11,000 m2 of aluminium frames, doors and curtain walling systems
  6. curtain wall profiles and tall cover stripsReynaersMentioned in More than 11,000 m2 of aluminium frames, doors and curtain walling systems
  7. Hollowcore floorsPrecoIn this story
  8. investorLarendaelMentioned in A new perspective on logistics property
  9. investorBridges Real EstateMentioned in A new perspective on logistics property
  10. Property investor and managerCentral Trade Park (CTP)Mentioned in A new perspective on logistics property
  11. contractorBouwbedrijf VrolijkMentioned in A new perspective on logistics property
  12. Steel structureReijrink StaalconstructieMentioned in A new perspective on logistics property
  13. structural engineerIMDMentioned in One of the largest precast concrete projects currently under way

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAmsterdam Logistic Cityhub
  • ThemeLogistics property that grows with you
  • SubjectMaterial handling
  • CompanyPreco
Share this article

Advertisement

Follow Warehouse & Logistiek

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.