Water authority aims to cut CO2 emissions by 95% during the Lauwersmeerdijk-Vierhuizergat dike reinforcement

Waterschap Noorderzijlvest will start work on the Lauwersmeer-Vierhuizergat dike reinforcement in 2023. By using electric machinery, the water authority aims to cut CO2 emissions by 95%. It plans to invest € 8.2 million in the project. Together with GMB and Heijmans, working as the Waddenkwartier contractor consortium, regional companies have also been asked to invest in cleaner, lower-emission machinery. This is an important incentive for making equipment more sustainable in the civil engineering and infrastructure sector.

Eisse Luitjens, member of the executive board of Waterschap Noorderzijlvest: “With this investment, we are making an important contribution to the ambition of the water authority and the national government to cut greenhouse gas emissions by 49% by 2030 compared with 1990. We are also showing that we are investing heavily in the energy transition in Groningen. I think it is fantastic that we, as a water authority, can contribute to this. We also need the Hoogwaterbeschermingsprogramma (HWBP) to fund the investment. The HWBP supports our ambition, and we are in constructive talks about the funding.”
Gérard Porton, project manager, on behalf of the Waddenkwartier contractor consortium of Heijmans and GMB: “Both Heijmans and GMB aim to build entirely emissions-free from 2026. This is an important step in the right direction. By using zero-emission equipment, we are working together to significantly reduce CO2 emissions during the dike reinforcement. Thanks to the efforts of Heijmans, GMB and regional companies, we are moving faster towards a sustainable, emissions-free construction site. We are extremely proud of that.”

Electricity- and hydrogen-powered lorries, cranes, trailers and generators
The equipment to be used includes a hydrogen-powered lorry, various large and small cranes, tipper lorries, tractors with trailers and generators. This electric equipment will save around 600,000 litres of diesel. That represents a 22% reduction in total diesel consumption. The diesel we use is fossil-free and renewable, known as Hydrotreated Vegetable Oil (HVO100) diesel. The use of electric equipment and HVO100 diesel together will cut CO2 emissions by 95% compared with using conventional equipment to reinforce the dike.
Reusing raw materials and enhancing biodiversity
As well as limiting emissions, we are reinforcing the dike by reusing raw materials and contributing to biodiversity. The project includes various measures to support biodiversity, such as fish migration and a freshwater-saltwater transition zone. It also includes artificial reefs in front of the dike, forming a natural transition, and the development of a natural salt marsh. Some sections of the dike will be sown with grass rich in flowers and herbs. The dike has also been designed according to circular principles. This means that almost 100% of the asphalt, clay and copper slag blocks from the existing dike will be reused in the new one, significantly reducing the need to bring in new raw materials.
About the Lauwersmeerdijk-Vierhuizergat dike reinforcement
From 2023, the water authority and its partners will reinforce the Lauwersmeerdijk in Groningen. The project covers 9 kilometres of sea dike between Lauwersoog and the Westpolder. As part of the reinforcement, we will also make improvements for nature, recreation and traffic. This will ensure that we remain well protected against flooding in the future, while also enhancing the area’s nature, recreational opportunities and accessibility.
Read more at lauwersmeerdijk.noorderzijlvest.nl
About the Hoogwaterbeschermingsprogramma
This dike reinforcement is part of the Hoogwaterbeschermingsprogramma. Under the HWBP, the 21 water authorities and Rijkswaterstaat are working together on the largest dike reinforcement programme ever undertaken since the Delta Works. At least 1,500 kilometres of dikes, as well as 500 locks and pumping stations, will be reinforced over the next thirty years. This is how we are working towards a country where people can live, work and enjoy their leisure time safely. Read more at www.hwbp.nl.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral



















