General

The solution for stronger dykes and keeping feet dry

The solution for stronger dykes and keeping feet dry

The family-owned Van den Herik has water engineering at its core. Its passion for working with water began in 1945, when large parts of the Port of Rotterdam had been destroyed. Founder Jan Hendrik van den Herik helped rebuild them as a stone setter. The company has since grown into a multidisciplinary business, specialising in both water engineering projects and the detection of conventional explosives. Van den Herik is known for its versatility, sustainable approach and innovative capabilities. One of its innovations is Piping Control.

River dyke safety is a major challenge. In the coming years, we face a huge dyke reinforcement task, involving an estimated 1,900 kilometres of dykes. One of the main causes of dyke failure is piping. Water seeps beneath the dyke, carrying sand with it, which weakens the dyke and can cause it to fail. The good news is that there is a solution: installing vertical, sand-tight geotextile. “In 2013, Waterschap Rivierenland asked us to develop a method for installing this geotextile,” says Jeroen Terlingen, manager of project support departments. “Our idea for a possible installation technique came out on top: Piping Control. This is an innovative method developed in-house to install geotextile vertically in the toe of the dyke, thereby preventing piping.”

Deep underground

Van den Herik uses a deep milling machine to install the material. The company has fitted the machine with a module about 3.5 metres high, which allows it to install the geotextile deep underground. This causes relatively little disturbance to the surrounding area. “The deep milling machine unfolds the fabric underground, while sand and clay are immediately added on both sides, following the original composition of the soil. We can install 350 metres a day. The relevant section of the dyke is sealed immediately. This offers significant advantages over traditional methods. First, it is no longer visible, and second, it requires no additional land, unlike the construction of an extra berm.”

The ‘clean ship’-certified trailing suction hopper dredger (TSHD) Charlock in action off the coast of Bloemendaal.

More sustainable and cost-effective

Research by six water boards shows that around 540 km of the more than 940 km of dykes surveyed are not sufficiently resistant to piping failure. Piping Control offers further benefits. In practice, it has proved more cost-effective than traditional methods. “For the 540 kilometres of dykes covered by the study, traditional solutions are estimated to cost three to four billion euros. Piping Control can halve the cost. It also saves 1,000 kg of CO2 for every 100 m of dyke. That is a reduction of around 35% in CO2.”

Just the tip of the iceberg

The method has now been proven in practice at Rijswijk and Ingen, as well as on the LiveDijk at Willemspolder. It was recently used in the Twentekanaal dyke improvement project, where the system was further developed so that the geotextile can now also be connected to structures in a sand-tight manner, and unlimited lengths of geotextile can be installed without interruption. We also now have a monitoring system that can verify that every metre of Piping Control has been installed in accordance with the requirements. In short, it is the solution for safe dykes and keeping feet dry, with plenty of opportunities to apply Piping Control as a preventive measure abroad too.   

Van den Herik

Industrieweg 24, 3361 HJ Sliedrecht

T +31 184 41 28 81

E [email protected]

www.herik.nl

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Follow Warehouse & Logistiek

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.