Flexible system solution delivers

The N200 runs through Halfweg via the Boezembrug and is an important link between Haarlem and Amsterdam. But the bridge no longer meets today’s requirements. Commissioned by Waterschap Amstel Gooi en Vecht, Gemeente Amsterdam, RWS and Waternet, construction consortium ééN200 is working on the Boezembrug to keep the region accessible and improve quality of life in Halfweg.
during renovation of the Boezembrug in Halfweg
Cees Abma, site manager at construction consortium ééN200: “To create a safe working environment for the people working on the deck of the Boezembrug, we chose PERI’s systems and services. PERI’s VARIOKIT system proved to be the solution for the structure along the edge of the Boezembrug deck. We also know that PERI produces a well-considered, engineered design that does what it is intended to do.”
A fine feat of engineering
“When accurate dimensions and taking the hassle out of the job, speed and safety are all key requirements, PERI is the partner for the task,” says Wout van de Weijer, design engineer at PERI. “The Boezembrug’s unusual shape in particular called for a fine feat of engineering and close collaboration between all parties.” The structure consists of standard VARIOKIT components, preceded by a bespoke design.

A suitable solution for supporting the concrete deck edge, despite the limited height of the precast beams and the location above the water.
System flexibility
“The flexibility of the VARIOKIT system made it possible to create a suitable, safe structure,” continues Van de Weijer. “By using straight beams in various sizes, we created a curve to follow the bend in the bridge. The main challenges were the limited height of the precast beams, working just above the water, a sheet-pile wall that was ‘in the way’, the inside curve of the bridge, and the fact that, once the new deck had cured, the structure had to be quick and easy to remove.” Abma adds: “PERI carried out the calculations, provided advice and ultimately produced a suitable design in 2D and 3D. They took care of everything for us.”
No challenge too great
PERI supplied the system in elements, as complete as possible, including a lifting and assembly plan, making it quick to assemble and easy to dismantle later. No challenge is too great, either for PERI or for the VARIOKIT system. Abma: “PERI really takes the whole picture into account, enabling a structure to be erected quickly and efficiently, so work can be carried out safely on the Boezembrug deck!”