“Asphalt is (in principle) 100% circular. We throw nothing away, we reuse everything, with the exception of tar-containing asphalt.” This is a statement by Ron Wesseling, Manager of the Bituminous Works Group at Bouwend Nederland. “However, tar-containing asphalt is responsibly removed from the supply chain, after which some of the cleaned materials can be reused. The point is that we have not agreed on a definition of circularity. In road construction, we produce more asphalt than we mill off the roads. So is it still circular? Of course, we use as much recycled asphalt as possible. That does not alter the fact that new asphalt will always be needed as long as more asphalt is required than becomes available.”

GWW Magazine talks to Bouwend Nederland

‘Asphalt Impulse’ brings the sector together

Wesseling continues: “In the coming years, road authorities, asphalt contractors, suppliers, designers, quality assurance bodies and knowledge institutions will face major challenges. These include contributing to the circular economy, the Climate Agreement and the Green Deal for Sustainable Civil Engineering 2.0. Ideally, all this should be achieved at lower cost, with less disruption and with due regard for the economic interests of companies producing and laying asphalt. That is why the sector has joined forces in the ‘Asphalt Impulse’ programme. Only by working together can we find solutions to all these issues.”

The partners brought together within Asphalt Impulse are Rijkswaterstaat, the 12 provinces, municipalities, CROW, TU Delft, University of Twente, Bouwend Nederland (Bituminous Works Group), independent asphalt producers and contractors, Eurobitume, TNO, Aveco de Bondt, Sweco, Kiwa Nederland, Kiwa KOAC and De Wegenscanners. “Together, we are seeking solutions to make asphalt more sustainable,” Wesseling explains. “Sustainability is an ongoing process. However, innovations must be accepted as solutions. In some cases, regulations stand in the way of innovation. The requirement to use ‘proven technology’ creates a chicken-and-egg situation. An innovation can only become proven technology once it has been used in practice.”

Agreeing clear standards

In road construction, sustainability is understood primarily as making asphalt last longer and reducing CO2 emissions. Wesseling says: “But how do you know whether you are operating sustainably if there are no clear agreements on what that means? What if you develop an asphalt mix that lasts 10 x as long on the road, but produces more CO2 emissions to manufacture? Is that acceptable? We want answers to questions like these. Through its Bituminous Works Group, Bouwend Nederland is bringing people together for this discussion. We are having it without any commercial agenda. In a way, we are neutral Switzerland within the group of partners. Bouwend Nederland serves a higher purpose, not just our own sector, but also the Netherlands as a whole and its citizens. We promote safe working and a level playing field, in a sustainable, circular way wherever possible, and want to establish standards and define terms. The benefits lie in being able to work more efficiently, thereby reducing costs.”

Old systems will be dismantled, and components that meet the procedure’s requirements will be reused.

The nitrogen debate

Johan Asscheman, Secretary of the Civil Engineering Concrete Construction and Specialist Road Construction Group at Bouwend Nederland, takes up the issue of CO2 emissions. “Bouwend Nederland is in talks with the government about this, because such discussions can only be held with representatives. We represent our sector. The question we ask is: ‘Where does the interest lie?’ The nitrogen debate is being led by the Ministry of Agriculture, which is responsible for the dossier. We are in talks with both the Ministry of Agriculture and the Ministry of Infrastructure and Water Management. The problem, however, cuts across ministerial boundaries, which is why we welcome the research carried out by the Remkes committee. A threshold value for construction must be established. The government has tasked Minister Carola Schouten with taking this forward,” says Asscheman. “Bouwend Nederland urges the minister to translate the recommendations in Remkes’s final report into policy as soon as possible and to introduce a threshold value.”

Sustainability in safety barriers

On the subject of sustainability and safety barriers, Addy van Doorn, chair of the Safety Barriers Committee of Bouwend Nederland’s Specialist Road Construction Group, says: “RWS has set up a working group to look at how existing safety barriers can be recycled. A new procedure has been introduced to demonstrate that the current model is safe and complies with the CE standard. Old systems will be dismantled, and components that meet the procedure’s requirements will be reused. This allows us to work as circularly as possible.”

Maintaining asphalt roads

From a sustainability perspective, it is preferable to extend the life of existing asphalt rather than replace it. Ton Kneepkens of Arcadis (technical partner to the EAB committee within Bouwend Nederland) explains: “We have been using emulsified asphalt concrete for some time to improve the surface course of asphalt roads. The asphalt top layer wears down due to traffic and weather, often resulting in surface texture damage and deformation. Emulsified asphalt concrete allows us to repair the surface course. It is, in effect, a bituminous coating that improves the road. One condition is that the road in question must not have serious structural damage, as we use emulsified asphalt concrete as a preventative measure. The better the underlying surface, the longer the new coating will last. On average, we are talking about extending the service life by around 7 years or more. It is a cold technique: the mix is prepared on site in a mobile processing unit. The quantity is measured, so there is no waste. By saving the energy required at an asphalt plant to produce hot asphalt, avoiding energy-intensive transport and eliminating the need for heating on site, we significantly reduce our CO2 footprint. And the best part? On average, the emulsified asphalt concrete surface course can be driven on after just half an hour. That’s what you call reduced disruption…”     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Follow Warehouse & Logistiek

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.