How do you future-proof a warehouse built in 1992? That was the question facing Toyota Parts Centre Europe in Diest. Workload was set to increase significantly over the coming years. Together with E’Log, the company opted for a major retrofit, on one condition: operations could not be interrupted. E’Log soon proved to be more than a supplier. A partner that thought things through, moved quickly and kept the project simple, without unnecessary complexity and with a focus on results.

Four cranes. Four crane rails. New travel and lifting motors. And a high-bay warehouse that is once again ready for the decades ahead. 

From 30 years of reliable service to a fresh start 

Safety and reliability are everything in Diest. The warehouse is one of the logistics hubs within Toyota Motor Europe. Together with thirteen other depots, the site handles 120 million parts and accessories for 44 European markets. From screws to bumpers, and small clips to doors. 

But growth brings pressure. 

“By 2030, we expect sales of parts to increase by 38%,” says Mark Seurs, maintenance manager at Toyota Parts Centre Europe. “So we need to make smart use of the space we have. The high-bay warehouse plays a key role in that.” 

The high-bay warehouse, an automated warehouse more than 30 years old, was originally intended for slow movers: large, bulky parts that rarely moved. Today, Toyota Parts Centre Europe is using it more strategically. No more slow-moving items, but parts with higher turnover that can be stored more efficiently. 

“The high-bay warehouse has enormous potential,” says Mark. “By storing bumpers and headlights more intelligently and making crane movements more efficient, we can make better use of the more than 5,000 pallet locations. But the system has to be reliable. We simply cannot afford downtime in the future. So we need to make sure it is reliable now.” 

What began as separate maintenance jobs grew into a single integrated project. E’Log had been maintaining the installation for two years and knew every nut and bolt. That experience brought three clear problem areas to light: wear on the rails, ageing motors and too little certainty about spare parts. It was time to take action. 

Modernising smartly instead of replacing 

Building a new warehouse was never an option. The structure was still in good condition. The solution was a technical retrofit that brought everything together: efficiency, reliability and minimal downtime. 

The approach was to work step by step. Only one crane was taken out of service at a time, so the warehouse remained operational five days a week. Four crane rails were replaced. Four high-bay cranes were overhauled. All travel and lifting motors were replaced. 

A spare parts plan was also put in place. Critical components were identified and held in stock, so Toyota would not be caught out by a breakdown at the wrong moment. 

“E’Log knew our installation inside out,” says Mark. “That gave us confidence. Together, we looked at what was most critical. They bring technical expertise, but also a practical mindset: how do you keep everything running while carrying out the upgrades?” 

Project coordination was tightly managed. Weekly meetings. Each phase better than the last. Small details were adjusted along the way, helping maintain both momentum and peace of mind. No unnecessary complexity, just clear steps and a transparent approach. E’Log’s maintenance technicians were involved from start to finish. Their knowledge, experience and flexibility gave us confidence.  

Making adjustments where needed 

Like every major project, this one had its surprises. The new rail was ten millimetres higher than expected, so the software and sensors had to be adjusted. And the motor sets held in stock? They were not a perfect fit for the existing cranes. 

“That came as a bit of a shock,” Mark recalls. “We were about to start when we suddenly found that the rail was not perfectly aligned. But thanks to the escalation plan and short lines of communication, it was resolved within a few hours. Work never stopped.” 

Safety always came first. E’Log worked closely with Toyota’s HSE manager and its maintenance partner Bilfinger, which supports the internal maintenance team at Toyota Parts Centre Europe. 

“Safety is our top priority,” says Mark. “E’Log and the other partners adapted well to that. Everything was thoroughly prepared, especially the coordination between work at height and work on the ground. That meant everyone could work safely. And if anything did go differently from plan, we discussed it immediately at our weekly meeting. That openness really worked.” 

An installation ready to grow with the future 

Four cranes and four rails later, the high-bay warehouse is as good as new. Perfectly aligned. Reliable. And ready for growth. 

“We’re set for years to come,” says Mark with satisfaction. “Reliability is back where it needs to be, and we have a partner that thinks ahead with us.” 

The real benefit is not what was renewed, but what was preserved: continuity. The retrofit made the high-bay warehouse more stable and efficient, without operations being interrupted for a single day. Today, Toyota Parts Centre Europe is making better use of the installation than ever: more capacity, greater certainty and less unexpected downtime. Exactly what the organisation needs for future growth. 

“If I had to give the project a score, I’d give it eight out of ten,” Mark concludes. “There are always areas for improvement, but the collaboration was open, professional and solution-focused. That is what matters most to us.” 

The high-bay warehouse retrofit shows that modernisation does not always mean starting from scratch. Sometimes it is smarter to build on what is already there. With the right expertise, the right people and a partner that thinks things through, even a 30-year-old installation can keep pace with the future with ease. 

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Follow Warehouse & Logistiek

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.