Anyone who has driven along the A15 near Sliedrecht over the past year will undoubtedly have seen it: the striking new office pavilion by Bouwonderneming Stout and project developer Herkon, with its hyper-modern floating design. Standout features of the new 1,200 m2 building include its large voids, imposing glass façades and anthracite-black façade bands. The building services installed by Klimaatservice Holland and Elektroservice Holland are also a feature, with some of them left exposed.
Klimaatservice Holland, based in Hardinxveld-Giessendam, values long-term, sustainable relationships, both with clients and suppliers. “We have been Stout’s installation partner for many years. Stout, together with Herkon and Lagendijk & Stout, forms Van Herk Groep,” says Jan Nederveen, new-build director at Klimaatservice Holland. “Shortly after we started in 1976, Stout asked us to install the climate control systems for its new warehouse and office in Hardinxveld-Giessendam. The building was extended several times, after which, around twenty years ago, we were commissioned to build a new office with a slightly more sophisticated climate control system, a little further along. This building was also extended and renovated several times. To support the rapid growth of both Stout and Herkon in the years ahead, plans for a third new building got under way in 2019, this time at Stationspark II in Sliedrecht.”

State-of-the-art technology
“It’s great to see how we’ve developed alongside Stout,” says Nederveen. “Both as a company and in terms of building services technology. In the first project, the heating and ventilation systems were already quite advanced, while cooling was added in the second. In Sliedrecht, we’ve now installed and intelligently integrated the very latest technology. Here too, wherever possible, we worked with long-standing partners and local companies. We also worked with our sister company Elektroservice Holland, founded around seventeen years ago, which was responsible for the entire electrical installation, from LED lighting and access control to the barrier system, CCTV, data network and PV system.”
Intelligently integrated
The climate control system is based on two air-source heat pumps, stylishly integrated into the design. “The top two floors of the office pavilion project out over the water at the front, while a car park has been laid out at the rear,” says Nederveen. “A pit was built at the edge of the car park, close to the water, to house both heat pumps. They provide heating and cooling to the 4-pipe ceiling induction units and are powered by electricity from the solar panels on the roof.” Underfloor heating and cooling has also been installed in several rooms. “All the systems for climate control, lighting and solar shading can be controlled intelligently, room by room, using a Priva system. CO2 sensors in the offices and meeting rooms also provide demand-controlled ventilation.”

Thorough preparation
“Based on the specifications, the aesthetic design by RoosRos Architecten and our extensive technical expertise, we developed the design for the mechanical and electrical installations,” says Nederveen. “A key requirement was to create a sustainable, gas-free office pavilion. To ensure a comfortable indoor climate in both winter and summer, for example, we carried out cooling-load and heat-loss calculations. We took plenty of time to engineer all the systems in detail and coordinate them. Construction only started after that.” The extensive preparation was necessary because the air handling unit and heat pumps had to be installed as soon as the ground-floor slab had been poured, he says. “The supply lines were installed beneath the car park deck, which is supported entirely on piles because of the challenging ground conditions.” A nice detail, in keeping with the building’s transparency, is that the plant room has not been hidden away. “Even the ground-floor plant room is fully visible. From the entrance, you can see the manifolds and control cabinets behind the glass. From the motorway side, you can also clearly see the heat recovery air handling unit behind the glass.”
Getting a little better all the time
In addition to their own buildings, Stout, Klimaatservice Holland and Elektroservice Holland have an impressive portfolio of regional projects, from large distribution centres and commercial buildings to care homes, says Nederveen. “We’ve also completed a number of excellent projects for the armed forces and the police. For example, we’re currently involved in building the police headquarters in Hilversum. As well as new-build work, we’re the go-to construction team for sustainability projects, where the building work and services are perfectly integrated. Together, we’re helping to make the world a little better all the time.”