Logistics centre in Zeebrugge opts for complete Daikin HVAC solution

The port of Zeebrugge has gained a new logistics site. Intervest Offices & Warehouses invested in a state-of-the-art platform for importing containerised goods into Europe, and vice versa. The first stone was laid in 2021. The project was completed a year later. The result is a 76,000m² logistics park where an optimal indoor climate is guaranteed thanks to Daikin’s energy-efficient products.

Divided into ten warehouses, each with ten loading bays and move-in-ready office facilities, the site is one of the largest logistics projects in West Flanders. In addition to the warehouses, it features a 22,000 m² container storage yard, a head office, parking for 200 cars, and a waiting and drop-off area for lorries. With this investment, Intervest aims to attract and accommodate Chinese and international logistics operators importing containerised goods into Europe from around the world, and vice versa. The initial focus is on e-commerce, automotive and food.

Complete HVAC solution for optimum comfort
For an industrial space like this, combining offices and warehouses, the challenge was to find the right heating and cooling solution for the different types of space. Daikin’s complete solutions ensure an optimal indoor climate. The head office and offices in the warehouses are equipped with a VRV system with heat recovery and associated indoor units. The warehouses, with a combined area of around 7,000 m², are heated and cooled by ten central air-to-water heat pumps, each with a capacity of 400 kW.
“Installing the heat pumps on the roof was a major undertaking, with a tight schedule. We also laid no fewer than three kilometres of pipework so that each warehouse could be fitted with the necessary air heaters,” says Thomas Claeren, Managing Director of Delvetere.
A productive working environment guaranteed
The Daikin VRV system with heat recovery was selected throughout the office areas. Maintaining the indoor temperature at the right level is important to maximise employee comfort. Individually adjustable concealed units make it possible to heat and cool the spaces all year round.

In the warehouses, it is particularly important to maintain a constant temperature in winter. Given the high capacity required, a central air-to-water system is the only suitable solution. Heat pumps are therefore used in combination with air heaters.
“Given the size of the warehouses, we had to think carefully about which system to use. The capacity required for each warehouse is so substantial that we ultimately opted for air-to-water heat pump solutions. The right temperature is maintained, as are indoor air quality and working comfort. The project is also BREEAM certified (Excellent rating), which is a significant added benefit,” says Frank Devenyn (Ingenium engineering consultancy).
Efficient control via I-Touch Manager
Given the size of the building as a whole, it makes sense to manage it from a central location. The owner chose Daikin’s Intelligent Touch Manager because it brings all the climate control units together in one system. The building is managed energy-efficiently via the interface. It shows which unit or zone uses the most energy, allowing the necessary action to be taken to reduce consumption and prevent energy waste. This is a major advantage for an industrial site like this.
Close collaboration ensures rapid installation
The biggest challenge in this project was the schedule. The entire project had to be completed within a year, which meant tight deadlines for installing the heating solutions. Good communication between the manufacturer, installer and engineering consultancy was essential. Which system should be chosen, and how could it be installed as efficiently as possible? The VRV system is a cost-effective solution that is easy for the installer to fit, as are the central air-to-water heat pumps in the warehouses. The result is an optimised system with a straightforward layout that meets the customer’s requirements.
“To speed up the work, we chose to fit the circulation pump and buffer tank to the heat pumps in advance at our Daikin factory. For each warehouse, the installer prepared a frame in its workshop, with the required components, such as filters and valves, already fitted. This helped ensure the heat pumps could be installed more quickly,” concludes Kris Mertens, Product Manager at Daikin.
Daikin’s complete HVAC solution at a glance:
- Fossil-free and climate-neutral solution
- 10 air-to-water heat pumps, each with a capacity of 400 kW, for climate control in the warehouses
- VRV with heat recovery for the head office
- Simultaneous heating and cooling in the offices with heat recovery
- All heat pumps used run on R32, a low-GWP refrigerant
- Central control via cloud controller
Have a business enquiry for Intervest? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectAutomation
- CompanyIntervest