Automation

46 metres high, 80,000 pallet locations

Text Hanne Verhaeghen Image Alheembouw

46 metres high, 80,000 pallet locations

Largest fully automated high-bay warehouse in the country

Dematra is a leading logistics operator active in the Benelux. At the De Prijkels industrial estate in Nazareth, the storage and distribution company expanded its capacity with a logistics warehouse and a fully automated high-bay warehouse. An impressive feat of architectural and construction expertise.

The logistics company Dematra specialises in the storage and distribution of food and non-food products. The firm, based in Nazareth, already has four warehouses in Belgium, with a total of 80,000 pallet locations. The new building doubles that number at a stroke. “Our brief was to make the most efficient use possible of the plot’s irregular shape,” says Charlotte Ballière of a154 architecten. “We gave careful thought to the positioning of the buildings and the relationship between the conventional warehouse and the high-bay warehouse.” 

“We worked out how the workflow would operate with lorries arriving and departing at the loading bay at the front. This led to a building comprising four sections: a 9,000 m2 block-stack warehouse and a 46-metre-high high-bay warehouse with almost 80,000 pallet locations, both with a four-storey front section.”

The building comprises a block-stack warehouse and a high-bay warehouse, both with a four-storey front section.

Unprecedented scale

Alheembouw was brought in to coordinate and oversee specialist contractors during construction of the high-bay warehouse. “We’ve already worked on the construction of 35 high-bay warehouses,” says Egon Braem, director of industry/retail at Alheembouw. “But this project for Dematra is on an unprecedented scale. It features a storage and racking system from stow, with automation by Ceratec. The new high-bay warehouse is not simply a building with racks inside. On the contrary, the racks form the building’s load-bearing structure. The walls and roof are then fitted around them.”

Not a building, but a machine

Construction began with substantial pile foundations. No fewer than 2,000 concrete displacement piles support the enormous weight of the warehouse. The racking contractor then got to work with two tower cranes. Modules were prefabricated at ground level, then turned and stacked on top of one another. “You can build a structure up to 30 metres high and install the racking afterwards. At 46 metres, we had to take a different approach. The fully automated high-bay warehouse is not simply a building, but a machine. It is also Belgium’s largest fully automated warehouse using stow’s Atlas® 2D shuttle system. The fully automated shuttles move around, collect pallets and take them to the lifts supplied by Ceratec.”

Smooth and safe construction thanks to 3D modelling

A key task for Alheembouw was to create a 3D model of the structure to prevent clashes. The building services, steel components, moving parts such as the lift: everything was included. “We also held a weekly clash meeting,” Charlotte adds. “By investing time in the meetings and 3D modelling, we were able to avoid potential problems and keep the construction process running smoothly and safely.”

2,000 concrete displacement piles support the enormous weight of the warehouse.

Future-proof

Cooling units are installed on top of the building. The ventilation ducts are integrated into the racking structure, allowing the entire building to be climate-controlled to maintain the optimum quality of the stored products. The walls and roof are clad with sandwich panels from Isocab Construct. “Sustainable, future-proof construction starts with building compactly and insulating well,” says Charlotte. “By building this warehouse 14 storeys high, we significantly reduce our environmental impact. Solar panels and air-to-water heat pumps complete the green picture.” 

By making some levels in the racking structure higher than average, Dematra can cater flexibly for different customers and products. The front section also reflects CEO Geert De Jaeger’s explicit request for a pleasant working environment. 

“We achieve that with plenty of natural light, bright colours and high ceilings,” says Charlotte. “The high-bay warehouse is a black box where no one goes, but a sense of space and a pleasant atmosphere are essential for employees in the offices.” ■

A business enquiry for Ceratec nv? Get in touch

Who worked on it

Dematra high-bay warehouse in Nazareth in Nazareth-De Pinte

  1. coordination and follow-upAlheembouw
  2. automationCeratec
  3. architectsa154 architecten
  4. storage and racking systemstow
  5. wall and roof cladding with sandwich panelsIsocab Construct

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDematra high-bay warehouse in Nazareth
  • ThemeMore warehouse space
  • SubjectAutomation
  • CompanyAlheembouw NV
  • CompanyCeratec nv
  • Companya154 architecten
  • Companystow
  • CompanyIsocab Construct
Share this article

Advertisement

Follow Warehouse & Logistiek

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.