Focus on safety
Text Geert Van Cauwenberge Image Axelent

Along Belgium’s E313 motorway in Laakdal, Heylen Warehouses is letting a new warehouse to Stobart Europe. This brand-new 45,000-square-metre distribution centre has been designed with a focus on efficiency and safety. Stobart Europe called on Axelent’s expertise to install safety solutions for its staff and infrastructure. Ruben Geenen, Safety Consultant X-Protect at Axelent, explains which solutions were installed to ensure safety.

“The fit-out of the new warehouse was completed under considerable time pressure,” says Ruben. “Stobart Europe asked us to supply and install a range of safety solutions, from wall and workstation protection to Pedestrian Barriers and Impact Barriers to protect warehouse staff. From the outset, we took an efficient and professional approach. Axelent is known for this organised and tidy way of working, a service that Stobart Europe greatly appreciated.”

Addressing safety risks
In the new distribution centre, where forklift trucks and other transport equipment are constantly on the move, potential risks to staff and infrastructure are ever-present. Ruben says: “Forklift accidents are among the most common incidents in logistics facilities, resulting in serious injuries and damage to infrastructure. Falling goods can block walkways, injure employees and severely disrupt workflow. Collisions with warehouse racking or walls lead to costly repairs and downtime.”
“We often see unprotected infrastructure and warehouse racking quickly damaged by repeated collisions. With our Impact Barriers and rack protection, we help Stobart Europe tackle these problems in a systematic way,” says Ruben.

A wide range of safety solutions
Ruben takes a closer look at some of the solutions supplied by Axelent. “For wall protection, we installed low impact rails around all the warehouse walls to minimise damage from forklift trucks and prevent costly repairs. We installed transparent plastic panels, 2.50 metres high, around workstations in the warehouse halls, allowing staff to carry out administrative work without noise disturbance. To ensure optimal pedestrian safety, we installed our Pedestrian Barriers. Our High Impact Barriers also provide extra safety around access gates: they ‘discourage’ pedestrians from using warehouse aisles with heavy forklift traffic. In this way, Axelent is doing its bit to reduce workplace accidents and create a pleasant working environment.”

Investing in staff and infrastructure
Now that the project has been successfully completed, the Axelent team remains in contact with Stobart Europe about possible future expansions or improvements. “Safety is not a one-off investment, but an ongoing process of improvement and adapting to changing logistics needs,” says Ruben. “This collaboration shows how combining smart safety solutions with a well-considered warehouse layout demonstrates that investing in safety pays off in the long term.”
“At Axelent, we continue to work with our customers to offer flexible safety solutions. Most impact protection systems on the market work well as shock absorbers, but are often difficult to install. They also lack genuine flexibility, are difficult to extend and often cannot be connected to an existing protection system. In other words, if you have a production hall or warehouse that needs expanding, you often have to dismantle your existing systems and start again from scratch. This is time-consuming and expensive. Once again, we have demonstrated to Stobart Europe our strength in supplying and installing customised solutions, even under considerable time pressure.”
A business enquiry for AXELENT? Get in touch
Who worked on it
Stobart Europe distribution centre Laakdal in Laakdal
- veiligheidsoplossingen
Axelent
Keep following this
Get an email when a new story is published. No account needed.
- ProjectStobart Europe distribution centre Laakdal
- SubjectWarehouse equipment & safety
- CompanyAXELENT



















