Revolutionary steel construction solution

Reijrink Staalconstructie has introduced the first fully reusable steel construction system, called Skellet. With a patent and sales rights for the Benelux and Germany secured, work began in January on the new division, Reijrink Skellet, with the aim of going into full production by mid-March. Skellet is a kind of steel ‘Meccano’ construction system that can be dismantled down to the smallest component. Both the sections and the connectors are fully reusable, meaning they also retain a high residual value. The system offers endless possibilities for building circular industrial halls, mezzanine floors, homes and offices, among other things.

Joost Reijrink and Rick Meeuwis.

As a builder of industrial structures and specialist in distribution centres, Reijrink Staalconstructie has for many years been able to call itself the greenest steel construction company in the Netherlands. Managing director Willem Reijrink says: “With the new division Reijrink Skellet, we are accelerating the development of circular solutions in the steel sector.” The demand for this is clear from a major contract in Belgium to build large industrial warehouses in Beringen entirely using the Skellet system.”

Innovation and sustainability

Building lightweight and circular structures reduces the use of new raw materials and the need for transport movements. “The Skellet system is a partial replacement for conventional hot-rolled steel. Welding can be eliminated entirely during assembly. All that is needed is a saw and a rivet gun. The modular nature of the system also makes it easy to modify or extend a structure.” The value retention of Skellet sections is backed by the Skellet SAFE guarantee. This guarantees compensation of up to 133% of the purchase price of the sections after the 15th year. Each section is branded and digitally registered for this purpose. 

Project: Double-deck warehouse in Venlo.

Multi-storey distribution centres

Reijrink Staalconstructie can claim another first. In response to the strong demand for storage capacity and a shortage of building land, the first two double-deck distribution centres in the Netherlands were built last year. “For a valued contractor, we built the Amsterdam Logistic Cityhub, which is 40 metres high. And for another valued contractor, the double-deck warehouse in Venlo. A different construction method is required for steel structures of this height. Assembly in particular is a challenge. Our expertise in this area helped secure our involvement in these projects.”

Skellet cross connector.

Lowest environmental cost indicator score

The environmental cost indicator (MKI) combines all relevant environmental impacts of a product into a single score. Reijrink Staalconstructie operates sustainably on many fronts. It starts at the engineering stage, where designs are created with future reuse in mind. This continues during production, through the use of sustainable steel and a production process in which 6,000 solar panels make the company fully self-sufficient in its electricity needs. It concludes with a fleet running entirely on HV100 diesel. “We also offer our customers a wide range of options. For example, they can choose the Greenline coating, which is less harmful to the environment than conventional paint. If required, we can assemble structures using electric cranes and access platforms. In other cases, we use machines that run and operate on HV100 diesel. We also offer electric transport to the construction site.” These efforts have resulted in Reijrink Staalconstructie achieving one of the lowest MKI scores in the Netherlands.

Reijrink Skellet premises in Tilburg.

Industry leader

Reijrink Staalconstructie is not only the greenest, but also the most automated steel construction company in the Netherlands. “Everything, from assembly to complete welding, is done fully automatically. And we handle everything in-house, from engineering to transport.” The steel construction company also invests continuously in technology, expertise and people, keeping pace with developments such as lean construction and Design & Build. The methods it has adopted earned it the BIM Award Benelux 2018, as well as several BREEAM ‘Outstanding’ design certificates.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow Warehouse & Logistiek

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.