Future-ready distribution centre for Amazon

In autumn 2022, Amazon opened the first phase of a state-of-the-art, future-ready distribution centre on the Blue Gate Antwerp site. This is the well-known multinational’s first base in Belgium, from which it aims to deliver to Antwerp city centre and the wider surrounding area with net-zero carbon emissions.

A range of public and private partners are working together to remediate Petroleum Zuid, once the heart of Antwerp’s petroleum industry, and give it a new, more sustainable future. Under the new name ‘Blue Gate Antwerp’, a 63-hectare carbon-neutral business park is taking shape just a few kilometres from the city centre. It is aimed at innovative companies with a clear ambition: to grow linearly by working circularly.
Bopro, AG Vespa and PMV, together with the city architect, selected a group of renowned architects to transform the extensive site through numerous individual projects into a hub for research and development, ecological production and smart logistics, right beside the Scheldt. A 14.5-hectare green corridor links the Hobokense Polder with the green spaces along the Antwerp Ring. The rest of the area will also have a strong green character. The business park can also be reached via a recreational cycle path running through and alongside the corridor.

AULA project
POLO Architects is one of the design teams working at Blue Gate Antwerp. Among other projects, the practice was responsible for Antwerp Urban Logistic Accomodation, or AULA. Its first phase, a state-of-the-art, future-ready warehouse with a parking structure, is complete. Amazon opened its doors there at the end of September 2022. The client is logistics investor Montea, which has been the exclusive partner for developing the logistics zone at Blue Gate Antwerp since February 2016. Montea primarily develops ‘next generation’ buildings that combine sustainability with low-impact urban distribution.
The warehouse’s prominent location on the Blue Gate site informs its design. At first glance, the substantial volume marks the entrance to the business park.
On closer inspection, a subtle rhythm comes into view. Vertically mounted fins create a striking play of lines. Façade panels perforated to varying degrees give the façade depth.

Natural light
At the front, the building comprises a 5,764 m² logistics hall and a spacious distribution area with 2,157 m² of office space and a 517 m² mezzanine. Generous horizontal strip windows bring in abundant natural light. The architects placed small service areas in each of the four ground-floor corners: an entrance area, plant room, lifts, stairs and toilets. Everything was kept as compact as possible to give the distribution area maximum space.
At the rear, Cordeel built a high-rise parking structure. Employees and visitors park on the ground floor, while the four floors above are used to park and charge the electric vans that handle the final-stage distribution. The parking structure has a total floor area of 40,000 m².
Canopy
A large canopy on the left, adjoining a green passage, connects the two buildings. Its truss structure is clearly articulated. Solar panels have been installed on the roofs of both the distribution centre and the canopy. Their height and detailing mean they are invisible from ground level.
With efficient operations in mind, POLO Architects designed the building around flows. Employees enter a space at one end and leave at the other. The same focus on efficiency is evident in an ingenious route plan for loading and unloading. A meticulously designed system allows vans to arrive and depart around the clock, safely and according to a precisely timed schedule.

BREEAM Excellent
The firm commitment to sustainability in the design is reflected in the clear ambition to achieve BREEAM Excellent certification. The building has mechanical ventilation with heat recovery and is airtight. To further reduce its environmental impact, the entire building is insulated on the façade and roof with mineral wool installed without adhesive, allowing elements and materials to be repurposed within the circular economy. All building systems are managed and controlled through a digital building management system. Smart monitoring ensures optimum energy use and a healthy, comfortable working environment. Rainwater is also collected and used. Finally, the building is connected to a district heating network.
A key part of the plan is also the shift to e-mobility. The building and its infrastructure are equipped to charge 450 electric vehicles, enabling CO2-neutral last-mile deliveries to the city of Antwerp and the surrounding area. Sixteen charging points have already been installed on the upper floors of the parking structure, with many more to follow in the near future. The aim is to have a fully electric fleet. Amazon aims to be carbon-neutral by 2040. The Antwerp site fits perfectly with that ambition.
In a later phase, POLO Architects will build a second facility of the same scale beside the current site. Both buildings will be positioned perpendicular to the Scheldt and separated by a green passage.

Question about this story? Ask your question
Who worked on it
AULA in Antwerpen
- clientBlue Gate Antwerp Building
- clientMontea
- architectPOLO Architects
- main contractorCordeel
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAULA
- ThemeLogistics property that grows with you
- SubjectGeneral
- CompanyBlue Gate Antwerp Building
- CompanyMontea
- CompanyPOLO Architects
- CompanyCordeel



















