Bridge as gateway to Parkstad

The new cycle bridge over the N274 will open on 20 February in Schinveld, Limburg, in the municipality of Beekdaelen. Ipv Delft designed the bridge in close collaboration with artist Marijke de Goey, who created the three artworks on the bridge. Together, the bridge and artworks mark the entrance to the Parkstad plus region.
The new bridge is part of the reconstruction of the N274 in the former municipality of Onderbanken. It provides a safe crossing for cyclists near the Kneijkuilerweg roundabout.
Route study
The bridge design was preceded by an extensive study of alternatives. Ipv Delft worked with a project group to identify the most suitable route, taking into account factors such as landscape integration, cycling comfort and construction costs. Just under half of the 350-metre route consists of a cycle path on raised embankments. The 188-metre bridge is located at the centre of the route.
To make both the bridge and its supports as slender as possible, the entire structure was built from prestressed, cast-in-situ concrete. The bridge is divided into several large spans of 28 metres. This creates a clear, continuous appearance and leaves the space beneath the bridge free to be used in different ways. The long spans also preserve unobstructed views of the distinctive surrounding landscape.
Maintenance
Using in-situ concrete gives the bridge a single, long, continuous form with no expansion joints. The baluster-free railing also contributes to this effect: it is identical along the entire bridge and has no dominant posts. For ease of management and maintenance, the railing is made of stainless steel, which requires little upkeep and retains its appearance for a particularly long time. For aesthetic, budgetary and practical reasons, the entire bridge structure was treated with Keim mineral paint. This coating gives the concrete a uniform colour.
Artwork
The three artworks are integrated into the bridge design and express the bridge’s role as a gateway. The largest artwork, consisting of several stacked cubes, stands at the centre of the roundabout, on the bridge support. Thanks to the close collaboration, De Lotusbloem, as the artwork is called, has also been genuinely integrated into the bridge structure. As a result, the fixings for the cubes are concealed.
The reconstruction of the N274 at Onderbanken was carried out by BAM Infra on behalf of the Province of Limburg. IBA Parkstad and the municipality of Beekdaelen (formerly Onderbanken) were closely involved in the project. The new cycle bridge is the defining feature of the upgraded provincial road.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral



















