Rapid growth sooner or later leads to a shortage of space. Just ask Testas, a leading stockholder of semi-finished aluminium, stainless steel and copper alloy products. The company, based in Wommelgem, recently expanded for the fourth time in its history. This time, it was a new storage hall with a fully automated high-bay warehouse. The 7,500-square-metre complex was built by ASK Romein in just six months, despite the coronavirus pandemic and harsh weather conditions.

Testas is part of the MCB Group and is a household name in the Belgian steel industry. Bars, tubes, wires, sections, sheets and fittings are available in all shapes, sizes, finishes and alloys. The company takes pride in processing orders at very short notice, and therefore boasts extensive stock and an efficient logistics flow. To continue guaranteeing high-quality service and continuity of supply, it had a new storage hall with a high-bay warehouse built for storing and processing steel sheets and sections. Testas called on ASK Romein for the project, a company with extensive experience in this type of work.
“We first built the superstructure of the high-bay warehouse and only afterwards installed the pit foundations”

Atypical construction sequence
The new storage hall covers approximately 7,500 square metres. Of this, 6,000 square metres is set aside for a standard storage area with a height of 10 metres, and 1,500 square metres for a fully automated high-bay warehouse with a height of 15 metres. “As the machine builder’s design was not yet finalised when construction began, we had no choice but to adapt the construction sequence,” says Niels Vorselaars, project manager at ASK Romein. “We first built the superstructure of the high-bay warehouse and only afterwards installed the pit foundations for the warehouse floor: 245 pits, each 80 centimetres in diameter and 4.25 metres deep. Finally, we laid a reinforced concrete floor that had to be capable of supporting not only the weight of the stock, but also the forces exerted by the robot as it constantly moves up and down. This ‘reverse construction method’ made the project quite unusual, although we have faced more challenging structural projects before.”
Constructed entirely from steel
Testas’s new storage hall is constructed entirely from steel. This is not only a nice nod to Testas’s core business, but also a structural necessity, explains Niels Vorselaars: “The spans are up to 36 metres, as Testas wanted an open-plan layout and did not want to be constrained by support columns in the middle of the hall. The steel supporting structure is finished with a plinth of concrete panels, a façade clad in screw-fixed sandwich panels and a steel deck. The building also incorporates five gates, two of which can be combined to create a single, 15-metre-wide opening in the façade, making it much easier to load large steel sections. We were also asked to take care of all the external works, including earthworks, road construction and the extension of the wadi. Apart from the building services, this was therefore a ‘turnkey project’ for us, with functionality taking priority. The poor weather and the coronavirus crisis made things more difficult, but we still managed to build the complex in just six months. Testas is extremely pleased with our work. They appreciated our transparent, down-to-earth approach and were particularly pleased that we actively contributed practical solutions and ways to minimise the burden on them. That is why we can rightly call this a very successful expansion!”
TECHNICAL SPECIFICATIONS
Client
Testas (Wommelgem)
Architect
Marc Andries (Wijnegem)
Main contractor(s)
ASK Romein (Malle)
Question about this story? Ask your question
Who worked on it
Testas storage hall Wommelgem in Malle
- ClientTestas
- ArchitectMarc Andries
- Main contractorASK Romein
Keep following this
Get an email when a new story is published. No account needed.
- ProjectTestas storage hall Wommelgem
- SubjectGeneral
- CompanyTestas
- CompanyMarc Andries
- CompanyASK Romein