In the Netherlands, primary flood defences must be assessed for safety every few years. Since 2017, this has been done using a new assessment system, the Statutory Assessment Instrument (WBI) 2017. The assessment also covers non-flood-defence objects (NWO) located on a flood defence, such as trees, buildings, cables and pipelines. These objects can affect the safety of the flood defence. For example, if a fallen tree leaves a scour hole, this could cause instability and damage to the protective revetment.
However, the assessment tools for NWO are not yet fully developed, and are not suitable for assessing large numbers of objects. So how do you assess thousands of objects? Is there a way to approach this intelligently and make it manageable?
6,000 trees and 3,000 buildings
The Hoogheemraadschap Schieland en de Krimpenerwaard (HHSK) has around 6,000 trees and 3,000 buildings on its 70 kilometres of primary flood defences. This is far more than most other water authorities, owing to the densely populated urban area in the region. All these objects must be assessed against the new statutory safety standards by 2023. HHSK held a market consultation to find out how companies viewed the problem. Following the consultation, HHSK set out the scope of its requirements and put the project out to tender. Iv-Infra and Tauw won the contract and are currently developing a method for assessing large numbers of objects efficiently.

Trees are identified as such.
A reliable and efficient method
Given the large numbers involved, it is important to assess the objects efficiently and to ensure that the method is traceable and reproducible, so that it can also be used in future assessment rounds. Reliability is another key aspect of the new method, as safety is at stake. But how can reliability be demonstrated? Iv-Infra and Tauw’s method is based on three pillars: securing information, applying knowledge and expertise, and automation.
Securing information
The water authority’s existing data is verified and validated, and supplemented where necessary. The digital register contains details of the objects, but these are subject to change. Trees grow or are felled, while houses are demolished or newly built. To update the register, Iv-Infra’s unique survey vehicle was used to map the non-flood-defence objects precisely. Where exactly is the tree, how tall is it, and what is its trunk diameter? These details can easily be measured using the survey vehicle. The additional data makes it possible to approve objects quickly, for example when it can be demonstrated that their dimensions are so small that any failure would have no impact on flood safety. This improves and streamlines the assessment of all non-flood-defence objects.

The specialist survey vehicle.
Applying knowledge and expertise
Iv-Infra and Tauw have extensive experience assessing primary and regional flood defences, and are currently working on several projects involving non-flood-defence objects. The specialist knowledge gained through this work is now being brought together and applied in developing the new method. Rather than following rules and guidelines rigidly, the teams also use their experience to ‘think logically’: for example, would a fallen tree really increase the likelihood of piping if it is behind a toe ditch that is deeper than the potential scour hole?
Automation
As much of the assessment process as possible is automated to make it as efficient as possible. The large volumes of GIS data collected from the existing database and the survey vehicle are supplemented with up-to-date elevation data captured by helicopter. Specially developed GIS scripts are then used to determine the relevant parameters for each object and automatically carry out the simple assessment. Automating this process reduces the risk of errors and cuts down on labour-intensive tasks.

GIS data visualisation.
Assessment in two stages
The non-flood-defence objects are assessed in two stages. The first is a simple assessment, which is almost entirely automated (around 90%). The remaining 10%, involving drawing contour lines, checking data, validation and field sampling, is carried out by advisers from Tauw and Iv-Infra. To avoid a labour-intensive process, the aim is to approve as many objects as possible through the simple assessment. However, additional calculations are inevitably needed for some objects. These are assessed in detail, with objects grouped into clusters and the governing object in each cluster assessed using additional calculations. The assessments are followed by a verdict: is the NWO safe or not? HHSK then takes any necessary measures based on this safety verdict.
Towards an individual assessment of every non-flood-defence object
To develop this new method, all available data has been analysed in detail, additional information has been collected, and innovative solutions are being devised. The process is still under development, but progress towards the final method is going well. The priority is to ensure that the data is reliable and traceable, and that the method is reproducible. This will ensure that the data can also be used in future assessments or reinforcement projects. Although some cases will still require a bespoke approach, developing this method marks an important step towards an accurate safety assessment of all non-flood-defence objects, whereas previously only a generic verdict was possible.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeSafe and healthy warehouse work
- SubjectGeneral